Fire Alarm System
Addressable and conventional fire alarm material schedules.
- Fire alarm control panels
- Smoke and heat detectors
- Manual call points and sounders
- Fire alarm cables and accessories
Prepare preliminary material quantity takeoffs, Bills of Quantities and project cost estimates for fire alarm, hydrant, sprinkler, fire pump and fire suppression systems with a practical estimation tool.
Organize quantities, unit rates and estimated material costs in one place.
Organize the major equipment and installation materials required for fire protection projects. Final quantities must be verified against approved drawings and site conditions.
Addressable and conventional fire alarm material schedules.
Hydrant network materials and associated equipment.
Sprinkler network and distribution materials.
Equipment and accessories for fire pump installations.
Special hazard fire suppression material estimation.
Building fire compartmentation and protection items.
Enter your project details, add material items and input the quantity and unit rate. Totals update automatically.
Complete the details before exporting your estimate.
Sample rows are editable. Replace them with project-specific data.
| No. | Item Description | Unit | Quantity | Unit Rate | Amount | Remove |
|---|---|---|---|---|---|---|
| 1 | 0.00 | |||||
| 2 | 0.00 | |||||
| 3 | 0.00 |
A good estimate starts with verified engineering inputs, not assumptions.
Review architectural layouts, approved fire safety drawings, equipment locations and design criteria.
Measure piping, cabling, devices, fittings, supports, equipment and other required materials.
Confirm specifications, approved brands, supplier quotations, labor rates and applicable taxes.
Check quantities and totals, then export the working estimate for review in a spreadsheet.
Key information about quantity takeoffs and project cost estimation.
A Fire Safety Bill of Quantities is an itemized schedule of the materials, equipment, quantities, units and rates required for a fire protection project. It is commonly used for budgeting, procurement, tendering and cost control.
MTO means Material Take-Off. It is the process of identifying and measuring materials from engineering drawings and specifications, such as pipes, fittings, detectors, cables, valves and equipment.
Yes. Enter an installation percentage, contingency percentage, other fixed costs and an optional tax or VAT percentage. These are planning inputs and should be adjusted to the actual contract and applicable tax rules.
Yes. Use Download BOQ CSV to export the item descriptions, units, quantities, unit rates, amounts and cost summary. CSV files can be opened in spreadsheet applications such as Microsoft Excel.
No. It calculates totals from the information entered by the user. It does not validate design adequacy, hydraulic performance, code compliance, actual site quantities or supplier pricing. Professional review is required before the estimate is used for formal submission or procurement.